the challenge
Requiring a full double-decker bus wrap, the Sir Bobby Robson Foundation wanted to introduce a recognisable presence to support its fundraising events and community activity. With customer-supplied artwork and a five-day turnaround, the project required accurate artwork preparation, colour reproduction and positioning across the scale and complexity of the vehicle. Everything needed to be precisely coordinated to ensure the finished bus was ready within the required timeframe.

the process
ARTWORK & COLOUR PREPARATION:
Working with the supplied artwork, our team prepared and adapted the design specifically for the double-decker bus, ensuring accurate scaling and positioning across the vehicle. Thorough colour matching was also completed before production to maintain consistency across the full livery.
PRODUCTION:
Once the artwork was prepared, the appropriate wrap material was selected for the application before the graphics were produced in-house. With a five-day turnaround, each stage was seamlessly managed to move the project efficiently from supplied artwork through to installation.
INSTALLATION:
Fitting took place on site, with our installation team professionally fitting the graphics across the vehicle’s panels, curves and detailing to achieve a high-quality finish across the complete double-decker.
the end product
Bringing the Sir Bobby Robson Foundation’s supplied artwork to life, the completed wrap transformed the full double-decker within the five-day turnaround. Since completion, the bus has attended the NE1 Dragon Boat Race, where it was positioned alongside the charity gazebo on the Quayside. It will continue to support the Foundation’s fundraising activity, including Play for Sir Bobby, its schools fundraising initiative, with upcoming school visits and activities planned.